Add roll, Job Card and quotation-estimate fields; lay Makap fields out in tabs
- Batch gets roll details (stage, width, length, micron, net/gross kg, supplier lot, machine, Work Order) so each roll is a traceable batch (B3). - Job Card gets operator output and waste capture on its first tab, with a derived waste % and a required reason whenever waste is entered. - Quotation Item can cost a line from an estimating BOM: material grossed up for expected waste, BOM operating cost, set-up and cylinder charge, with the resulting margin shown against the quoted rate (M4). - About 120 fields used to stack after amended_from with no sections. They now sit in a "Makap" tab per form (a section on child rows) with labelled sub-sections, and positions are updated on migrate (m1). - Tooling Readiness is read-only: it is derived from the cylinder register. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
@@ -22,6 +22,9 @@ doc_events = {
|
||||
"Work Order": {
|
||||
"validate": "makap_backend.makap_backend.controls.validate_work_order",
|
||||
},
|
||||
"Job Card": {
|
||||
"validate": "makap_backend.makap_backend.controls.validate_job_card",
|
||||
},
|
||||
"Quality Inspection": {
|
||||
"validate": "makap_backend.makap_backend.controls.validate_quality_inspection",
|
||||
},
|
||||
|
||||
Reference in New Issue
Block a user