- Batch gets roll details (stage, width, length, micron, net/gross kg,
supplier lot, machine, Work Order) so each roll is a traceable batch (B3).
- Job Card gets operator output and waste capture on its first tab, with a
derived waste % and a required reason whenever waste is entered.
- Quotation Item can cost a line from an estimating BOM: material grossed up
for expected waste, BOM operating cost, set-up and cylinder charge, with
the resulting margin shown against the quoted rate (M4).
- About 120 fields used to stack after amended_from with no sections. They
now sit in a "Makap" tab per form (a section on child rows) with labelled
sub-sections, and positions are updated on migrate (m1).
- Tooling Readiness is read-only: it is derived from the cylinder register.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>