4304b97e5b
- Batch gets roll details (stage, width, length, micron, net/gross kg, supplier lot, machine, Work Order) so each roll is a traceable batch (B3). - Job Card gets operator output and waste capture on its first tab, with a derived waste % and a required reason whenever waste is entered. - Quotation Item can cost a line from an estimating BOM: material grossed up for expected waste, BOM operating cost, set-up and cylinder charge, with the resulting margin shown against the quoted rate (M4). - About 120 fields used to stack after amended_from with no sections. They now sit in a "Makap" tab per form (a section on child rows) with labelled sub-sections, and positions are updated on migrate (m1). - Tooling Readiness is read-only: it is derived from the cylinder register. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>